Boat designed: George Buehler. Started deck beams on December 1,2004. Keel and deck beams went to the boat shed December, 2006. I have been working on this project for about 10 years and have not lost interest in it. My progress continues. I lost two years due to the storm Sandy. My progress on the boat far exceeds the posts on this site.I am going to post pictures showing progress. Bottom line is building is better than blogging.
Sunday, January 19, 2014
Floors on Keel
Once the keel was set and sealed it was time for the floors to be attached. Each floor was made from 2- 2"x 12" laminated and nailed . They were drilled and placed over the keel bolts at each station, bolted down using ogee washers. Later the frames will be attached to these floors. Station spacing on the Duck is 2 feet with no intermediate frames.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment